Why the Corridor Scheduler Holds Authority in the Cell and Not in a Global Optimizer
The corridor scheduler will not be a single global 4D trajectory optimizer. Each airspace cell keeps its own reservation ledger. Aircraft fly on time-bounded leases that the cell issues. The network-wide planner only proposes routes and holds no authority that an aircraft in flight depends on, and this record explains why we turned down the alternative and what evidence would have made us take it.
The option we rejected, stated fairly
The centralized design is a strong design, and we did not reject it for being naive. One service holds the full state: every aircraft, the forecast wind and convective field, and the capacity of every corridor. It solves deconfliction jointly, so there are no seams at cell boundaries and no handoff protocol to verify. When a storm line closes a corridor, it reroutes the whole fleet consistently in one pass, so one neighbourhood's diversions never dump traffic onto the next cell and set off a second wave of reroutes. It also makes the audit trail simpler, because a single deterministic solver produced every trajectory. In clear weather it carries more parcels: our simulations put the gain over the cell design at roughly 8 to 12 percent higher corridor utilisation, an estimate that depends heavily on the demand model.
Where it breaks
The failure mode that decided this is a weather event that closes corridors and degrades the ground link at the same moment. Those two things are correlated, not independent. The same convective system that forces a replan also takes out cellular backhaul, rooftop relays and sometimes grid power at the operations site. So the optimizer becomes unreachable exactly when replanning demand peaks. An aircraft flying a globally computed trajectory has no local authority to change it safely, so every aircraft becomes a contingency at once and they tend to converge on the same few alternate pads. A design whose worst case is a fleet-wide simultaneous contingency is the wrong shape for a dense network, however well it performs on an ordinary day. There is a certification cost as well. Under airborne and ground software assurance guidance in the DO-178C lineage, a solver that every aircraft's safe trajectory depends on becomes a high-criticality item, and verifying a large optimizer to that level is a programme in its own right.
What we chose and what it costs
Authority sits with the cell. An aircraft may occupy a cell's volume only under a valid lease of 90 seconds, which it renews while it is in that cell. Every lease is issued together with a reserved contingency: a holding point inside the cell or a pad slot that the ledger has already debited, so if a renewal fails the aircraft runs a pre-agreed manoeuvre and never has to improvise one. The global planner still optimizes across the network, but it does so by requesting leases from cells. If the planner is lost, the network loses throughput but stays safe. Boundary handoffs use a two-phase reservation between neighbouring ledgers, and an unreachable neighbour is treated as a closed boundary. We accept the seams, the extra protocol to verify, and the clear-weather utilisation we give up compared with the centralized solver.
The condition that would change the answer
The decision flips only if the ground segment can show a worst-case replan round trip shorter than the 90 second lease, measured under the same degraded weather that closes corridors and over a second, independent communications path, so the rule for every future review is that comparison: if that guaranteed latency is below the lease, centralize authority, and if it is not, authority stays in the cell.
Technical FAQ: Doesn't simultaneous lease expiry across a cell recreate the same common-mode contingency you rejected?
It would, if leases expired together and the contingencies competed for the same capacity. Two things prevent that. Lease phases are staggered when the leases are issued, and each contingency slot is debited from the cell's ledger at that same moment, so a cell can never promise more holding volume or pad slots than it has. The cost is lower peak density, because reserved contingency capacity is capacity that carries no parcels. The next decision is how aggressively to reuse those slots across leases whose expiry windows cannot overlap.